Wednesday, March 14, 2012

More progress on the Study

i know that the pictures are all jumbled, but this is a picture of Michael's study, the bottom two are of us still in the sanding and texturing phase. Michael picked out the colors, I think that it is going to look great. The door is coming next, in about a week, Michael is hoping sooner. it will be nice to have a work place for him. But as soon as that is done I am going to have to start on the living room (the other side of the wall).





Thursday, March 8, 2012

New Wall with Sheetrock










Now we have the Sheetrock on and the mud. Sanding is next, YUCK! But it has to be done. We also replace the whole where the tile was with pre-finished wood flooring. Didn't Michael do a Great Job!!!!





Okay, so looking at the blog, I realized that it has been a year since I have posted anything, but, since no one else has posted anything, I don't feel too bad.
Sarah has been bugging me about sending her pictures for the wall that we are building, so I decided this would be the best place for it. The pictures that are shown are that of the wall frame, the chimney that was uncovered, and the tile that we got rid of.